Manual curtain installation procedure

The installation of the shade outdoor blinds usually requires professional operation, the following is an overview of the general shade shutter installation tutorial.

Manual shade outdoor blinds installation procedure:

Choose UNITEC’s room darkening window treatments fabrics!

1. Install accessories

 

Decide the left and right direction of the head and the vertical direction of the bead, the left and right side of the head can be interchangeable, and everyone can install the head according to their own habits. The bead head can be rotated, respectively corresponding to the side and top mounting after the pull up use.

UNITEC's Room darkening window treatments Fabrics Collection
shade outdoor blinds

Think Different: Get Ahead of Your Competition. Buy the Economic Blackout Blinds Fabrics from an established manufacturer to reduce risk and reduce overhead.

Fabric Name – Code: URB8105-URB8108

Composition: 100% Polyester with acrylic coating,none-formal

Specification: 100% Blackout (Complies to AS 2663.3.1999), UV Protection: Tested to AS/NZS 4399:1996, Blackout Performance: UVA 99.95% | UVB 99.95

Width: 2.0m, 2.5m, 2.8m, 3.0m, 89mm, 127mm
Weight: 350g±5% (g/m2)
Thickness: 0.43±5%mm
Color Fastness:5-6 Grade

Fabric Name & Code: T-PVC URB03

Composition: 1 ply fiberglass, 3 ply PVC (25% Fiberglass, 75% PVC)

Width: 183cm, 200cm, 244cm, 250cm, 300cm, 89mm, 127mm
Weight: 460g/m2 ±10%
Thickness: 0.39mm±5%

shade outdoor blinds

2. Install the head:

Exterior

 

Compare the window with the finished product, find the right point, mark the position of the head screw on the window frame or wall, tighten the left and right head with the screw to the window frame or wall, and then open the rotable module of the head without pulling beads.

 

Built-in

 

Place the finished shade outdoor blinds in the window frame, find the appropriate point, mark the position of the head screw on the top of the window frame, use the screw to lock the left and right heads respectively on the top of the window frame, and lift the rotating module of the head without pulling beads.

shade outdoor blinds

3. Install shade outdoor blinds rails:

(1) First put the right end of the upper rail into the system head with a bead, and the left end of the upper rail into the system head without a bead.

(2) Fasten the open rotatable module to ensure that the curtain will not fall easily and the installation is complete.

(3) Gently pull down the bead curtain near the front and raise the rolling curtain.

(4) Pull down the bead curtain at the back, and the rolling curtain drops.

In general, there are window frames installed in the window frame. If you do not like the leakage on both sides, you can choose the outer fitting. We can find more physical pictures of different effects on the Internet and choose the most suitable one combined with personal preferences.

shade outdoor blinds

In general, there are window frames installed in the window frame. If you do not like the leakage on both sides, you can choose the outer fitting. We can find more physical pictures of different effects on the Internet and choose the most suitable one combined with personal preferences.










    Inquery now

    SUBSCRIBE TO OUR NEWSLETTER

    FOLLOW US

    Facebook Twitter Google+ LinkedIn Pinterest YouTube Instagram WhatsApp Skype

    Skype

    Email me E-mail